Subject: How to consider Hydropower Dam Posted: 7/1/2022 Viewed: 3725 times
hello,
I would like to know how to consider a hydroelectric dam in WEAP.
should the turbined volume be considered as a request site or is the turbineship taken into account when I fill in the hydropower part?
please respond to my message.
Ms. Anne Hereford
Subject: Re: How to consider Hydropower Dam Posted: 7/15/2022 Viewed: 3569 times
Dear Moussa,
If i understand correctly your question, you should set the Hydrowpower Priority under the Hydropower section of the Reservoir data. This will tell WEAP whether to operate the reservoir prioritizing electricity generation or downstream demands. You will then need to enter the Maximum Turbine Flow so that WEAP knows how much water can be used to generate electricity.
Anne
Mr. Moussa Konda
Subject: Re: How to consider Hydropower Dam Posted: 7/19/2022 Viewed: 3521 times
thank you