Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "request for help"
Log in to post new messages or reply to existing messages.
 
Author Message
Dr. Abdel Fatah Berredjem

Subject: request for help   
Posted: 12/3/2014 Viewed: 18567 times
how to model a drinking water treatment plant
Ms. Stephanie Galaitsi

Subject: Re: request for help   
Posted: 12/3/2014 Viewed: 18548 times
Dear Abdel Fatah,

The short answer is no - there is no node in WEAP for a plant that takes water from the river, cleans it, and then feeds sends it to the city.

BUT the long answer is that there are many ways to include this process in your model anyway, depending on your purpose.

If you are looking to model the cost of providing river water to the city, we recommend building a transmission link that has capital cost + cost/cubic meter built in to simulate the treatment cost. You can also specify that the trasmission link loses some percentage of the water, like a treatment process would.

If it's water quality you're trying to simulate (eg from a dirty river), you can do it, but it's complicated. You'd have to build a transmission link from the river to a dummy demand site that has the same demand as the real demand site but consumes no water, then sends its return flow to a wastewater treatment plant, which cleans the water to the specifications that you want, and finally sends its return flow to the real demand site.

Topic "request for help"