Subject: Forcasting Groundwater recharge from Soil Moisture Methode Posted: 5/15/2012 Viewed: 28869 times
I am currently working on a bassin in northern region of Bénin inIWRM field.
I would like to use Soil Moisture Method to forcast Ground water recharge.
Please how can I do to change the parameters ot that algorithm to fit my cas
Topic "Forcasting Groundwater recharge from Soil Moisture Methode"