Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

Environmental News
'Subterranean estuaries' crucial to sustainable fishing and aquacultur...
Pioneering research suggests 'subterranean estuaries' may be critical in managing sustainable fishing and aquaculture --...

Chemicals from human activities in transplanted oysters far from popul...
Wastewater treatment facilities clean the water that goes down our sinks and flushes our toilets, but they do not remove...

Antarctic Circumpolar Current flows more rapidly in warm phases
Our planet's strongest ocean current, which circulates around Antarctica, plays a major role in determining the transpor...
Source: Science Daily
LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "Query regarding hydropower generation"
Log in to post new messages or reply to existing messages.
 
Author Message
Mr. Prakhar Modi

Subject: Query regarding hydropower generation   
Posted: 2/28/2017 Viewed: 6938 times
Hello,
If I am working on the planning level and is suggesting to provide the reservoir, then how to how to get the hydropower generation results. I want to know what values should I enter in Maximum turbine flow required for generating hydropower and also how should I fix the tailwater elevation?
Ms. Stephanie Galaitsi

Subject: Re: Query regarding hydropower generation   
Posted: 3/1/2017 Viewed: 6899 times
Dear Prakhar,

The maximum turbine flow and tailwater elevation are both physical attributes of the reservoir. If the reservoir you are modeling is already built, you should find out what those measurements are. If the reservoir is not already built, the engineering design should have some information about these parameters.

The values that you enter will be very important in determining the hydropower generation, so if you want to produce accurate generation estimates, these parameters will need to be as accurate as possible.
Topic "Query regarding hydropower generation"