Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "River Simulation"
Log in to post new messages or reply to existing messages.
 
Author Message
Eng. Mohamed Abbas

Subject: River Simulation   
Posted: 7/15/2014 Viewed: 27978 times
Hi, I am doing a research in the Blue Nile river basin from Lake Tana in Ethiopia till Khartoum city in Sudan. I tried to simulate the flow at Eldeim station (gauge station) by choicing Inflow to Area - River - Streaflow Relative to Gauge (Absolute), after running the model. knowing that there are 13 triebutaries above this station. where I add headflow for each of these tributaries.
When I add the headflow for the first one (above lake Tana reservoir) this will remain till Eldeim station, whithout adding the other tributaries (12) for the simulation. Please advice
Dr. Devaraj de Condappa

Subject: Re: River Simulation   
Posted: 7/16/2014 Viewed: 27940 times
Dear Mohamed,

I am sorry, I don't understand your question. Would you mind to reformulate it?

Thanks!
Eng. Mohamed Abbas

Subject: Re: River Simulation   
Posted: 7/20/2014 Viewed: 27921 times
Dear, Devaraj
Many thanks for willing to help .. really I edit headflow data for each tributaries (i.e. 13 tributaries)all these tributaries join the main river at different locations including the first tributaries comprising the main river, But when I click a right click on the main river (after connection of all tributaries) and select edit data headflow I noticed the file was not the sum of all these tributaries but was only the first one at the head of the river that I edit it. Am I right, or there was an error.
Dr. Devaraj de Condappa

Subject: Re: River Simulation   
Posted: 7/20/2014 Viewed: 27911 times
Dear Mohamed,

Ok now I understand your question.

What you are seeing is normal. Headflow is the flow at the head of the river. So if you are looking at the main tributary the headflow is indeed the flow at the head (= beginning) of the river, the one you entered initially and WEAP does not change it.

What you are looking for is actually not the headflow but the flow downstream, after all the tributaries have joined the main river. This flow you can only view it in the Results view (ie WEAP has to run), under Supply and Resources > River > Streamflow. Make sure you select the result for the main river and select the node after the last tributary has joined the main river.

Kind regards,
Eng. Mohamed Abbas

Subject: Re: River Simulation   
Posted: 7/21/2014 Viewed: 27902 times
Dear, Devaraj

Thank you very much for your assistances.

Yours,

Mohamed

Miss Anum Dar

Subject: Re: River Simulation   
Posted: 7/24/2014 Viewed: 27818 times
Hi Devaraj,

I read your reply to Mohammed. I have a question, perhaps you can also help me. I have modelled a river in Alberta along with its tributaries and have also added the demand sites. Now I can see the results of water demand, supply requirement, unmet demand, coverage etc. but how can I tell anyone that this much amount of water is there in the river after satisfying all the demand sites? Is there an option in results to see the remaining water available in the river?

Anum
Dr. Devaraj de Condappa

Subject: Re: River Simulation   
Posted: 7/24/2014 Viewed: 27811 times
Dear Anum,

Yes you can see this with the same Streamflow results I told Mohamed to look at. On your schematic, look at the name of the nodes on the river that WEAP creates for each transmission link from the river to the demands. Then in the Streamflow results search for these nodes and there you can view the flow before and after these nodes.

Kind regards,
Miss Anum Dar

Subject: Re: River Simulation   
Posted: 7/25/2014 Viewed: 27783 times
Hi Devaraj,

Thanks for your reply. I have one more question: I have a demand site with the name "Petroleum" and it has sub-branches as shown below:

Petroleum
1.Surface Mining
2.Insitu
2.1 Atha
2.2 Peace
2.3 Cold Lake

Now I want to provide water to these sub-branches by three different rivers. For more simplicity, I would say that I want to provide water to sub-branch "surface mining" and "atha" by Athabasca river, to sub-branch "peace" by peace river and to sub-branch "cold lake" by cold lake. Is there any option in WEAP to do it? I mean by giving percentages of how much the total annual activity of a demand site is to be met by which river?

Anum


Dr. Devaraj de Condappa

Subject: Re: River Simulation   
Posted: 7/26/2014 Viewed: 27777 times
Dear Anum,

Yes there is a way:

1. Connect your Petroleum water demand to all the water supply sources (Athabasca river, peace river and cold lake).

2. Right click on the transmission link from Athabasca river and select Edit Data > Maximum Flow Percent of Demand. Entere here the % you want and do the same for all the transmission links.

3. If you are quite familiar with WEAP, you can be fancy with the following options:
* you can enter a monthly % as a function of the sub-branch (i.e., surface mining, different in-situ categories);
* I would advise you to use the Expression Builder and use Branches to ask WEAP to use the values you entered for the 'Annual Activity level' and the 'Monthly Variation' of the sub-branches of the Petroleum water demand. Like this you just need to enter values in the sub-branches of Petroleum water demand and it will automatically reflect in the transmission links (e.g., you would consider scenarios where you are changing the Petroleum water demand);
* in any case, don't forget to check that at every time step the % you entered for Maximum Flow Percent of Demand sums to 100% accross all the transmission links.

I hope my explanations are clear enough. Please tell me if not the case.

Kind regards,
Miss Anum Dar

Subject: Re: River Simulation   
Posted: 7/29/2014 Viewed: 27744 times
Hi Devaraj,

I tried doing it in the way you told but was not successful. I have some confusion. The sector is:

Petroleum Sector for Athabasca
- Bitumen Extraction
- Surface Mining
- In-Situ
- Gas/Chemical Plants

Petroleum Sector for Peace
- Petrochemical Plants

Let's say for insitu, I want the water from the two river sources: Athabasca and Peace river. If I will use "Maximum Flow Percent of Demand" then do I have to calculate the percentage of each sub-sector (bitumen extraction and then its sub-sectors: surface mining and insitu and also Gas/Chemical Plants) in the petroluem sector for Athabasca and then put that percentage in the Maximum Flow Percent of Demand?? If yes, how will I calculate the percentage of each as it is annual acitvity dependent which keeps on changing every year?

I am not good with expression builder so I have no idea of how to utilize that in my case. Need your assistance.

Anum

Dr. Devaraj de Condappa

Subject: Re: River Simulation   
Posted: 7/30/2014 Viewed: 27738 times
Maybe in your case it is better that you create more than just one main water demand. I would advise you to do it based on the geographical location of each sub-category (e.g., one water demand for Bitumen Extraction, one for Surface Mining etc).

Kind regards,
Miss myat mon

Subject: River Simulation   
Posted: 2/6/2018 Viewed: 11551 times
Hello,
I would like to ask about my case. In my case, there have 5 stations from upstream to downstream along the river that I considering. I have temperature, rainfall and discharge data for each stations. I used the streamflow gauge and put discharge data for 5 stations. I would like to know about headflow of the river. How could I calculate and take the headflow from these data?

Thank You
Ms. Stephanie Galaitsi

Subject: Re: River Simulation   
Posted: 2/6/2018 Viewed: 11546 times
Dear Myat,

If you would like to use your temperature and precipitation data to produce the headflow of the river, you can use a hydrologic model. There are different types of hydrologic models in WEAP - you will pick which one you want when you build a catchment node and go to the data view. Note that you will need additional data too, although the additional data you'll need will depend on the hydrologic model that you select.

You can read about the models in the Help Menu, or the WEAP tutorial (available www.WEAP21.org/tutorial ) has a chapter about hydrology.

Ms. Jacquelin Montoya

Subject: Re: River Simulation   
Posted: 12/13/2019 Viewed: 7585 times
Dear Dr. Devaraj de Condappa,

I am trying to view the observed vs the simulated gauge, and have applied just the procedure you mentioned:
Supply and Resources > River > Streamflow

It appears correctly the observed gauge vs the simulated gauge or "Reach", for some rivers.
However, for the main river it appears only the observed data and not the simlulated ("Reach"). Could you please tell me with is the issue here?


Topic "River Simulation"