Welcome to WEAP's Website WEAP
WEAP is an initiative of the Stockholm Environment Institute.


About WEAP

Home
Why WEAP?
Features
What's New?
Sample Screens
Demonstration
Publications
History and Credits

Using WEAP
Download
Licensing
User Guide
Tutorial
Videos (YouTube)

User Forum
Discussions
Members List
Edit Profile

Additional Support
Training
University Courses
Collaboration

About Us
SEI-US Water Resources Program
Please Contact Us

LEAP
Interested in Energy?
Read about LEAP: SEI's software for energy planning.

Link WEAP and LEAP for combined Water-Energy planning.
Watch a video demo!
   

User Forum

All Topics | Topic "Delay the runoff in the FAO method"
Log in to post new messages or reply to existing messages.
 
Author Message
Mr. Damien Le Bellour

Subject: Delay the runoff in the FAO method   
Posted: 5/30/2012 Viewed: 24795 times
Hi all,

I am working at the daily time scale and I have problems to delay the runoff. I think water available from rain of one day is only available for this precise day because the river streamflow is equal to 0 for non rainy days (with the FAO method).

So I want to delay the runoff on several days since the beginning day of the rain. I read the topic "How To "delay" The Flow" (2/13/2007) and I found a solution if using the soil moisture model. Because I don't have a lot of information on my cathchment, I prefer to use the FAO method. Does someone know if there is a solution to delay the runoff with this method ?

Thanks

Damien
Dr. Mehdi Mirzaee

Subject: Re: Delay the runoff in the FAO method   
Posted: 5/31/2012 Viewed: 24761 times
Hi,

Have you tried to make an Expression by Expression builder?
you can write some sort of function to make a delay for runoff, but I am not pretty sure about daily simulation.
Just check all of functions and look at their examples.

Regards,
Mehdi
Mr. Damien Le Bellour

Subject: Re: Delay the runoff in the FAO method   
Posted: 6/1/2012 Viewed: 24752 times
Hi, thank you for your answer.

Unfortunately, I didn't find a useful function to delay runoff at a daily time scale. I think I will try to do it with the soil moisture method by calibrating parameters with PEST.

I have another question : in the soil moisture method, is it possible to directly enter ETref (as in FAO) or is it always calculated according to climate conditions (temperature, humidity, wind, cloudiness fraction ...) ?

Thanks

Damien
Topic "Delay the runoff in the FAO method"